Long overdue update...

Wednesday, July 30, 2008

A lot has happened since I last posted!  Right now, I'm managing 2 blogs (this one and a personal one, which is private) and I'm sorry that this one fell through the cracks.  I would like to turn this one into more of a family/personal blog vs. solely a construction blog, so I redesigned the layout and created a new header as motivation!  Hopefully my posts will be more frequent and more interesting now!

To quickly bring you up to speed on the progress of our house:
     1) We reviewed and signed off on the blueprints April 18, 2008.
     2) We broke ground May 12, 2008.
     3) Foundation:  Foundation was dug, 1st rough-in for plumbing, the basement walls
           were poured, then the basement floor and garage floor were poured.
     4) Framing:  The walls were framed, then the roof was installed.
     5) House was covered in Tyvek and windows and doors were installed.
     6) Shingles were installed on the roof.
     7) Mechanicals:  Second rough-in for plumbing, 1st rough-in for electrical, cable,
           and phone/Internet.
     8) Exterior:  Siding was installed (still need shutters as of this post).
     9) Insulation was installed.
     10) We had our pre-drywall meeting July 25, 2008.  Only minor points needed addressed.
     11) They began installing drywall later that day.
     12) Our driveway and some of our sidewalk have been poured.

Here are some photos of the progress so far -- July was a busy month for us!